Page tree
Skip to end of metadata
Go to start of metadata

Synchronise with Netcad

It is a feature that allows the drillings contained in the project database to be transferred from the 3D screen to the 2D screen.

The drillings observed on the 2D screen after the process of synchronization with Netcad are found in the layers "DRILLINGS_LABEL" layer. 

During synchronization, the tags under the drillings will be transferred to the 2D screen when the labels are open

  • No labels